Mar '23 - Jun '23 @ Olympiada, Chalkidiki
Mechanical installation works at Hellas Gold Mine in Olympiada, Chalkidiki
Project Owner: HELLAS GOLD S.A.
Main Contractor: ΗOWDEN UK Limited
Installation of two axial fans (2x1MW) for the ventilation of the mine
Sep '22 - Feb '23 @ Kamari, Attiki
Kiln Line 1 Upgrade for Alternate Fuels Project at TITAN Cement Plant
Project Owner: TITAN Cement Company
Main Contractor: ERGOTEM S.A.
Erection works of Kiln Line 1 Upgrade.
- Main building structure (1100tn)
- Calciner ducts (160tn)
Jan '21 – Oct '22 @ Kozani, West Macedonia
Supply and Installation of Exhaust Gas Desulphurization System of Unit V in SES Agios Dimitrios
Project Owner: Public Power Company S.A.
Main Contractor: AVAX S.A.
Erection works of the booster fan and its auxiliary equipment (lube oil system, sealing air system, etc.)
Construction, testing, preparation and commissioning of the following mechanical equipment:
- Oxidation Air Blowers
- Limestone Unloading System
- Compressed Air Equipment
- Gypsum Dewatering System Equipment
- Primary Gypsum Dewatering System Hydrocyclones & Antiblocking Filters
- Gypsum Silo Discharge Equipment
- Agitators (Absorber, Emergency Storage Tank, other tanks)
- Absorber Recirculation Pumps
- Process Pumps (Slurry pumps)
- Water Pumps
- Mist Eliminators
Dismantling of drift eliminators, cooling fill, water distribution piping of the cooling tower of Unit V in Ag. Dimitrios Power Plant
Erection of the FRP clean exhaust gas pipeline inside and outside the cooling tower
Erection of Automatic Side Filtration System (sand-filter)
Erection of Side Filtration Unit interconnection pipes and their metal supports
Oct '18 - Oct' 20 @ Ptolemaida, West Macedonia
SES PTOLEMAIDA - Installation of a Steam Power Unit V with a gross power of 660 MWel, fueled with pulverized lignite, and capable of providing a thermal power of 140 MWth for district heating
Project Owner: Public Power Company S.A.
Contractor: TERNA S.A.
Installation of boiler sootblowers (long and part retractable)
Installation of Fly Ash Conveyor System
Installation of pulverized lignite ducts
Installation of two I.D. FANS (2x11MW) and two Recirculation Fans (2x1MW)
Nov '23 – Apr '24 @ Ptolemaida, West Macedonia
Dismantling of Ash Silos and Material Management of Units I-IV of SES Ptolemaida
Project Owner: Public Power Company S.A.
Main Contractor: SOLERGON S.A.
Dismantling of electrostatic filters, ash silos, air preheaters (louvo), ducts and pipelines of the inactive Steam Electric Station
May '24 @ Soroni, Rhodes Island
Dismantling Works in SES Soroni
Project Owner: Public Power Company S.A.
Main Contractor: TH.MAVRIDIS PCC
Dismantling, demolition, rehabilitation at the site of the inactive 66kV electric substation of SES Soroni in Rhodes Island
Jul'23 - Aug'23 @ Agios Efstratios Island
Hybrid system to produce electricity and heat from RES on the island of Agios Efstratios
Project Owner: Centre for Renewable Energy Sources and Saving (CRES)
Main Contractor: Terna Energy
Installation of district heating distribution network
Oct '16 - Jul '17 @ Kozani, West Macedonia
Upgrading of Boiler of Units III & IV in SES Agios Dimitrios to reduce NOx emissions
Project Owner: Public Power Company S.A.
Main Contractor: ERGOTEM S.A.
Installation of lignite ducts, air pipelines, lignite burners and oil burners in mills 1, 2, 3 and 4 of Unit IV.
Installation of lignite ducts, air pipelines, lignite burners and oil burners in mills 1, 2, 3 and 4 of Unit III